US 281 SB over ENCINO RIO RD
US 281 AT ENCINO RIO RD · County 029, Texas · Built 2020 · 5 Lanes · 45,600 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.630783, -98.459903
This bridge is in worse condition than 42.5% of bridges in County 029. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
US 281 NB over ENCINO RIO RD
Built 2020
US 281 NBML over EVANS RD
Built 2020
US 281 SBML over EVANS RD
Built 2020
EVANS RD over DRAIN
Built 1987
ENCINO RIO RD over WEST ELM CREEK
Built 1990
US 281 SB over REDLAND RD
Built 2020
US 281 NB ENT RAMP over REDLAND RD
Built 2020
US 281 NB over REDLAND RD
Built 2020
EVANS RD EB over WEST ELM CREEK
Built 1986
EVANS RD over MUD CREEK
Built 1995
Bridge Details
- Structure #
- 150150025304272
- Year Built
- 2020
- Length
- 89.9 m (294.9 ft)
- Max Span
- 35.1 m
- Width
- 26.5 m (86.9 ft)
- Lanes
- 5
- Daily Traffic
- 45,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.