IH 10 NFR over CIBOLO CREEK
BEXAR-GUADALUPE CO LINE · County 029, Texas · Built 1933 · 1 Lanes · 160 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
29.501417, -98.186375
This bridge is in worse condition than 96.6% of bridges in County 029. The average bridge in Texas is 0 years old; this one is 93 years old.
Nearby Bridges
IH10 MLs. over Cibolo Creek
Built 2023
IH 10 EBFR over Cibolo Creek
Built 2023
IH 10 over DRAW
Built 1932
FM 2538 over IH 10 ML
Built 2023
IH10 WBFR over Draw
Built 2024
IH 10 EBFR over Draw
Built 2023
IH 10 WBFR over Woman Hollering Creek
Built 2023
IH10 ML over Woman Hollering Creek
Built 2023
TRAINER HALE ROAD over WOMAN HOLLERING CREEK
Built 2012
IH 10 EBFR T/A over IH 10 ML
Built 2023
Bridge Details
- Structure #
- 150150002502011
- Year Built
- 1933
- Length
- 132.3 m (434.1 ft)
- Max Span
- 36.6 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 1
- Daily Traffic
- 160
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $629,000
- Total Project Cost
- $786,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.