US 90 WBML over LOOP 13 (MILITARY DR)

1.3 MI E OF IH 410 · County 029, Texas · Built 1968 · 3 Lanes · 9,621 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
150150002408210
Year Built
1968
Length
61.6 m (202.1 ft)
Max Span
16.8 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
9,621
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$955,000
Total Project Cost
$1,433,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.