OLYMPIA PKWY over IH 35

1.16 MI S OF CIBOLO CREEK · County 029, Texas · Built 1960 · 2 Lanes · 7,710 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
150150001607096
Year Built
1960
Length
93 m (305.1 ft)
Max Span
19.8 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
7,710
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,000
Total Project Cost
$20,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.