Deer Rim Dr over Drain
0.25 Mi W of Halsey Dr · County 491, Texas · Built 2017 · 2 Lanes · 473 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.605406, -97.882042
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 9 years old.
Nearby Bridges
STONE BRANCH DR over DRAW
Built 2022
COLLABORATIVE WAY over DRAINAGE DITCH
Built 2013
SAGE RANCH DR over DRAW
Built 2022
W San Gabriel Pkwy over DRAINAGE DITCH
Built 2013
McCallum Dr over DRAINAGE DITCH
Built 2007
San Gabriel Pkwy over Draw
Built 2022
McCallum Rd over Drainage Ditch
Built 2020
HALSEY DR over DRAINAGE DITCH
Built 2006
Devine Lake Bend over Draw
Built 2022
US 183 NBFR over DRAW
Built 2021
Bridge Details
- Structure #
- 142460H09760001
- Year Built
- 2017
- Length
- 7.3 m (24 ft)
- Max Span
- 1.8 m
- Lanes
- 2
- Daily Traffic
- 473
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.