FALCON LN over DRAW
0.40 MI SE OF MORNING DOV · County 491, Texas · Built 2006 · 2 Lanes · 600 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.635617, -97.872997
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 20 years old.
Nearby Bridges
Mourning Dove Dr over Draw
Built 2012
US 183 over DRAW
Built 2012
US 183 SBFR over DRAW
Built 2012
Whitewing (US 183) over Draw
Built 2012
US 183 NBFR over DRAW
Built 2012
CR 259 over Draw
Built 2020
Larkspur Lake Blvd over Draw
Built 2017
CR 259 over Draw
Built 2020
US 183 SB over S FRK SAN GABRIEL RIVER
Built 2012
US 183 NBFR over SOUTH SAN GABRIEL RIVER
Built 2010
Bridge Details
- Structure #
- 142460AA1475001
- Year Built
- 2006
- Length
- 6.7 m (22 ft)
- Max Span
- 1.8 m
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.