SEQUOIA TRAIL WEST over PECAN BRANCH
250 W OF ESPARADA DR E · County 491, Texas · Built 1986 · 2 Lanes · 100 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.684283, -97.697303
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 40 years old.
Nearby Bridges
ESPARADA DRIVE E over PECAN BRANCH
Built 1986
SEVILLA DRIVE over PECAN BRANCH
Built 1986
VAL VERDE DRIVE over PECAN BRANCH
Built 1986
MALAGA DRIVE over PECAN BRANCH
Built 1986
SERANADA DRIVE over PECAN BRANCH
Built 1986
NORTHWEST BLVD over PECAN BRANCH
Built 1999
SPRINGWOOD LN over DRAW
Built 2002
LAKEWAY DR over PECAN BRANCH
Built 1995
NORTHWEST BLVD over DRAW
Built 1998
LAKEWAY DR/CR 190A over PECAN BRANCH
Built 1990
Bridge Details
- Structure #
- 142460AA0900001
- Year Built
- 1986
- Length
- 7.3 m (24 ft)
- Max Span
- 2.1 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.