S Investment Loop over Draw
0.1 MI E OF VENTURE BLVD · County 491, Texas · Built 1990 · 2 Lanes · 300 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.537692, -97.582939
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 36 years old.
Nearby Bridges
US 79 WB ML over CHANNEL CREEK
Built 2006
N Investment Loop over Draw
Built 1990
US 79 EB ML over CHANNEL CREEK
Built 2006
SH 130 SB ML over US 79 & UP RR
Built 2006
US 79 NB ML over SH 130 FR
Built 2006
US 79 SB ML over SH 130 FR
Built 2006
SH 130 NB ML over US 79 & UP RR
Built 2006
US 79 over DRAIN
Built 1926
BENELLI DRIVE over DRAW
Built 2017
US 79 EB ML over CARMEL CREEK
Built 2006
Bridge Details
- Structure #
- 142460AA0498001
- Year Built
- 1990
- Length
- 8.2 m (26.9 ft)
- Max Span
- 2.1 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.