SH 95 over BATTLEGROUND CREEK

3.00 MI S OF US 79 · County 491, Texas · Built 1954 · 2 Lanes · 5,142 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
142460032101012
Year Built
1954
Reconstructed
1964
Length
57.9 m (190 ft)
Max Span
9.1 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
5,142
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.