US 183 NB over MCNEIL RD/SPICEWOOD SPRG

0.2 MI N TRAVIS/WMSN CL · County 491, Texas · Built 1998 · 4 Lanes · 71,430 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
142460015105104
Year Built
1998
Length
245.1 m (804.1 ft)
Max Span
42.7 m
Width
21.7 m (71.2 ft)
Lanes
4
Daily Traffic
71,430
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.