N IH 35 OFF RAMP over UPRR & MCNEIL RD

1.1 MI S OF US 79 · County 491, Texas · Built 2018 · 1 Lanes · 207,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
142460001509681
Year Built
2018
Length
511.5 m (1678.1 ft)
Max Span
76.2 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
207,900
Material
Concrete Continuous
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.