IH35 N T/A @RM2243 over IH 35
0.9 MI S OF SH 29 · County 491, Texas · Built 2015 · 1 Lanes · 91,060 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.621381, -97.690125
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 11 years old.
Nearby Bridges
RM 2243 over IH 35
Built 1989
IH 35 NBFR over DRAINAGE
Built 2015
IH 35 SBFR over SOUTH SAN GABRIEL RIVER
Built 2007
IH 35 NBFR over SOUTH SAN GABRIEL RIVER
Built 2015
IH 35 SB over SOUTH SAN GABRIEL RIVER
Built 1965
IH 35 NBML over SOUTH SAN GABRIEL RIVER
Built 1965
SS 26 over WEST FK OF SMITH BRANCH
Built 1934
SS 26 over DRAW
Built 1934
IH 35 NBFR over WEST FORK SMITH BRANCH
Built 2015
MADISON OAKS AVE over Draw
Built 2003
Bridge Details
- Structure #
- 142460001509639
- Year Built
- 2015
- Length
- 79.2 m (259.8 ft)
- Max Span
- 39.6 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 1
- Daily Traffic
- 91,060
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.