ELROY RD over DRY CRK EAST TRIB

2.1 MI EAST OF TX 130 · County 453, Texas · Built 2022 · 3 Lanes · 3,969 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
142270AA1307002
Year Built
2022
Length
8.7 m (28.5 ft)
Max Span
1.5 m
Width
28 m (91.9 ft)
Lanes
3
Daily Traffic
3,969
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.