US 290 EB over BIG DRY CREEK

3.15 MI W OF SH 95 · County 453, Texas · Built 1940 · 2 Lanes · 13,873 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
142270011403059
Year Built
1940
Reconstructed
1959
Length
30.5 m (100.1 ft)
Max Span
6.1 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
13,873
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$96,000
Total Project Cost
$120,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.