CENTER POINT RD over BEAR CREEK

4.4 MI S OF SH 16 · County 171, Texas · Built 1922 · 1 Lanes · 253 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
140870AA0185002
Year Built
1922
Length
27.7 m (90.9 ft)
Max Span
2.1 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
253
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.