US 290 over THREE MILE CREEK

12.6 MI E OF US 87 · County 171, Texas · Built 1955 · 4 Lanes · 9,990 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
140870011302040
Year Built
1955
Reconstructed
1966
Length
48.2 m (158.1 ft)
Max Span
7.9 m
Width
16.6 m (54.5 ft)
Lanes
4
Daily Traffic
9,990
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$163,000
Total Project Cost
$204,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.