Maldonado Trail over Drainage Ditch
0.5 Mi NE of FM 812 · County 021, Texas · Built 2005 · 2 Lanes · 114 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.104525, -97.600339
This bridge is in worse condition than 39.9% of bridges in County 021. The average bridge in Texas is 0 years old; this one is 21 years old.
Nearby Bridges
Maldonado Trail over Drainage Ditch
Built 2005
FM 812 over DRAINAGE DITCH
Built 1989
Twin Creek Circle over Drainage Ditch
Built 2020
FM 812 over MAHA CREEK
Built 1955
JACOBSON RD over MAHA CREEK
Built 1987
Linden Rd over Maha Creek
Built 2022
Sun Chase Pkwy over Draw
Built 2019
STONY POINT DR over TRIB MAHA CREEK
Built 2021
SH 21 over DRAW
Built 1943
SH 21 over FM 812
Built 2001
Bridge Details
- Structure #
- 140110AA3236001
- Year Built
- 2005
- Length
- 12.2 m (40 ft)
- Max Span
- 3.7 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 114
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.