COPPERAS CREEK PAS over COPPERAS CREEK
1.9 MI S OF US 71 · County 021, Texas · Built 2021 · 2 Lanes · 128 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
30.075761, -97.277369
This bridge is in worse condition than 76.3% of bridges in County 021. The average bridge in Texas is 0 years old; this one is 5 years old.
Nearby Bridges
RIVERSIDE DRIVE over DRAINAGE DITCH
Built 2018
RISING PINES DRIVE over ALUM CREEK
Built 2021
SH 71 EB over SL 150 (TAHITIAN DRIVE)
Built 2016
SH 71 WB over SL 150 (TAHITIAN DRIVE)
Built 2016
SH 71 over LITTLE ALUM CREEK
Built 1948
SH 71 EB over SH 21 & SH 95
Built 2018
SH 71 WB over SH 21 & SH 95
Built 2018
SH 21; SH 71 EB RP over UPRR; MLK; GILLS BR
Built 2021
SH 21; SH 71 WB RP over UPRR; MLK; GILLS BR
Built 2016
SH 21; SH 71 EBML over UPRR; COLLEGE ST; MLK DR
Built 2023
Bridge Details
- Structure #
- 140110AA0435001
- Year Built
- 2021
- Length
- 23.9 m (78.4 ft)
- Max Span
- 3.7 m
- Lanes
- 2
- Daily Traffic
- 128
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.