STOCKDALE RANCH RD over WEST YEGUA CREEK
0.4 MI N OF PAINT CRK RD · County 021, Texas · Built 2007 · 2 Lanes · 68 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
30.287289, -97.15795
This bridge is in worse condition than 39.9% of bridges in County 021. The average bridge in Texas is 0 years old; this one is 19 years old.
Nearby Bridges
CR 162 over PAINT CREEK
Built 2017
CR 168 (LEE CO RD) over DRAW
Built 2010
CR 169 over LONG BRANCH
Built 2018
OLD HWY 20 over GOODWATER CREEK
Built 1922
US 290 WB over GOODWATER CREEK
Built 2015
US 290 EB over GOODWATER CREEK
Built 2015
US 290 WB over Rocky Creek
Built 2022
US 290 EB over ROCKY CREEK
Built 2020
US 290 WB over MID SPRINGS CREEK
Built 2015
US 290 EB over MID SPRINGS CREEK
Built 2015
Bridge Details
- Structure #
- 140110AA0143001
- Year Built
- 2007
- Length
- 18.3 m (60 ft)
- Max Span
- 18.3 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 68
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.