FM 535 over DRAW

2.3 MI NW OF SH 21 · County 021, Texas · Built 2004 · 2 Lanes · 6,456 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

30.114181, -97.520594

This bridge is in worse condition than 39.9% of bridges in County 021. The average bridge in Texas is 0 years old; this one is 22 years old.

Nearby Bridges

Bridge Details

Structure #
140110080705026
Year Built
2004
Length
24.4 m (80.1 ft)
Max Span
24.1 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
6,456
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.