FM 535 over PINEY CREEK

0.7 MI NW OF SH 304 · County 021, Texas · Built 2013 · 2 Lanes · 1,059 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
140110080701080
Year Built
2013
Length
39.6 m (129.9 ft)
Max Span
21.3 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
1,059
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.