SH 21; SH 71 EBFR over UPRR; MLK; GILLS BR

0.3 MI W of SH 21/SH 95 · County 021, Texas · Built 2021 · 3 Lanes · 20,680 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
140110026505140
Year Built
2021
Length
154.5 m (506.9 ft)
Max Span
39 m
Width
13.4 m (44 ft)
Lanes
3
Daily Traffic
20,680
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.