US 290 over OAK CREEK

0.1 MI E OF SH 95 · County 021, Texas · Built 1941 · 5 Lanes · 27,543 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
140110011404069
Year Built
1941
Reconstructed
2006
Length
11.9 m (39 ft)
Max Span
2.4 m
Lanes
5
Daily Traffic
27,543
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.