CR 252 over W BERNARD CREEK RELIEF

4.45 MI E OF US 90A · County 481, Texas · Built 2022 · 2 Lanes · 19 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
132410AA0252005
Year Built
2022
Length
19.8 m (65 ft)
Max Span
19.8 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
19
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.