US 59 NBFR over BOONE BRANCH
2.38 MI W OF FM 2919 · County 481, Texas · Built 2022 · 2 Lanes · 20,021 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.426972, -96.032519
This bridge is in worse condition than 35.9% of bridges in County 481. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
US 59 SB over SAN BERNARD RIVER
Built 1996
CO RD 214 over DRAW
Built 2018
US 59 over PREISLER CREEK
Built 2024
CO RD 225 over DRAW
Built 2018
CO RD 216 over BOONE BRANCH
Built 2006
US 59 NBFR over Preisler Creek
Built 2022
US 59 over BU 59
Built 2023
US 59 NB over FM 2919
Built 2008
US 59 SB over FM 2919
Built 2008
CO RD 225 over W BERNARD CREEK RELIEF
Built 2014
Bridge Details
- Structure #
- 132410008908256
- Year Built
- 2022
- Length
- 14.9 m (48.9 ft)
- Max Span
- 14.9 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 20,021
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.