US 77 NB over GRADALUPE RIV RELIEF #4

2.20 MI SW OF US 87 · County 469, Texas · Built 2017 · 2 Lanes · 8,228 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
132350235001209
Year Built
2017
Length
109.7 m (359.9 ft)
Max Span
27.4 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
8,228
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.