CR419 EL DORADO RD over WILLOW CREEK
0.60 MI W OF CO RD 306 · County 321, Texas · Built 1987 · 2 Lanes · 291 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
28.981642, -96.152161
This bridge is in worse condition than 47.9% of bridges in County 321. The average bridge in Texas is 0 years old; this one is 39 years old.
Nearby Bridges
HOFFMAN RD over TRES PALACIOS RIVER
Built 1993
FM 1468 over WILLOW CREEK
Built 1971
FM 1468 over TRES PALACIOS RIVER
Built 1959
CR418 N HOFFMAN RD over DRAW
Built 1995
LEZAK RD (CR 425) over WILLOW CREEK
Built 2016
FM 1468 over NO NAME DRAW
Built 2003
FM 2431 over TRES PALACIOS RIVER
Built 1960
FM 1468 over DECROW CREEK
Built 1959
FM 2431 over JUANITA CREEK
Built 1960
CR 423(MORALES RD) over TRES PALACIOS RIVER
Built 1993
Bridge Details
- Structure #
- 131580AA0309001
- Year Built
- 1987
- Length
- 18 m (59.1 ft)
- Max Span
- 4.6 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 291
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.