MILLION DOLLAR RD over W BRANCH MAD ISLAND SLGH

0.8 MI E CR 378 · County 321, Texas · Built 2002 · 1 Lanes · 52 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
131580AA0209001
Year Built
2002
Length
18.3 m (60 ft)
Max Span
4.6 m
Width
7.3 m (24 ft)
Lanes
1
Daily Traffic
52
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.