STUBBLEFIELD/CR118 over CANEY CREEK

0.7 MI W OF FM 1301 · County 321, Texas · Built 1988 · 1 Lanes · 22 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
131580AA0108001
Year Built
1988
Length
28.3 m (92.8 ft)
Max Span
4.3 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
22
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.