FM 521 over COLORADO RIVER RELIEF

3.05 MI W OF SH 60 · County 321, Texas · Built 2013 · 2 Lanes · 1,865 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
131580084603017
Year Built
2013
Length
149.4 m (490.2 ft)
Max Span
21.3 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
1,865
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.