BS 35-H over DRAW

1.33 MI S OF SH 35 · County 321, Texas · Built 2018 · 2 Lanes · 1,172 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
131580017914112
Year Built
2018
Length
11.9 m (39 ft)
Max Span
2.4 m
Width
18 m (59.1 ft)
Lanes
2
Daily Traffic
1,172
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.