SH 35 NB over WEST CANAL

2.65 MI W OF SH 60 · County 321, Texas · Built 1961 · 3 Lanes · 12,498 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
131580017906057
Year Built
1961
Reconstructed
1971
Length
27.7 m (90.9 ft)
Max Span
9.1 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
12,498
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.