CR 256 over YOUNGS BRANCH

1.45 MI E OF SH 95 · County 285, Texas · Built 1984 · 1 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
131430AA0200001
Year Built
1984
Length
22.6 m (74.1 ft)
Max Span
21.9 m
Width
5.4 m (17.7 ft)
Lanes
1
Daily Traffic
100
Material
Steel
Design
Other
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.