US 77 SB over Big Brushy Creek

1.5 Mi S of SH 111 · County 285, Texas · Built 1951 · 2 Lanes · 5,792 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
131430037002024
Year Built
1951
Reconstructed
1994
Length
107 m (351 ft)
Max Span
27.4 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
5,792
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.