FM 531 over Yellow Bank Creek

1.35 Mi W of US 77 · County 285, Texas · Built 2016 · 2 Lanes · 251 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

29.294633, -96.987669

This bridge is in worse condition than 29% of bridges in County 285. The average bridge in Texas is 0 years old; this one is 10 years old.

Nearby Bridges

Bridge Details

Structure #
131430026910044
Year Built
2016
Length
36.6 m (120.1 ft)
Max Span
15.2 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
251
Material
Prestressed Concrete
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.