CR 127 over LAVACA RIVER
0.6 MI SW OF FM 822 · County 239, Texas · Built 1972 · 1 Lanes · 97 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
29.059044, -96.777167
This bridge is in worse condition than 95.3% of bridges in County 239. The average bridge in Texas is 0 years old; this one is 54 years old.
Nearby Bridges
CR 127 over Lavaca River Relief
Built 2015
FM 822 over KELLER BRANCH
Built 1965
CR 125 over KERR BRANCH
Built 1997
FM 822 over KNAPP BRANCH
Built 2020
FM 822 over KERR BRANCH
Built 2011
FM 822 over BEARD BRANCH
Built 1965
CR 128 over Chicolete Creek
Built 2015
FM 822 over MILBY BRANCH
Built 2011
FM 234 over WEST DRY CREEK
Built 1954
CR 283 over NAVIDAD RIVER
Built 1984
Bridge Details
- Structure #
- 131210AA0174002
- Year Built
- 1972
- Reconstructed
- 1984
- Length
- 60 m (196.9 ft)
- Max Span
- 22.9 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 97
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,000
- Total Project Cost
- $8,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.