US 59 SB over FM 530
3.2 MI NE OF SH 111 · County 239, Texas · Built 1972 · 2 Lanes · 11,663 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.002969, -96.598506
This bridge is in worse condition than 68.2% of bridges in County 239. The average bridge in Texas is 0 years old; this one is 54 years old.
Nearby Bridges
US 59 NB over FM 530
Built 1972
FM 530 over Drainage Ditch
Built 1957
US 59 SB over LP 521
Built 1972
US 59 NB over LP 521
Built 1972
FM 530 over NAVIDAD RIVER
Built 2022
US 59 SB over Navidad W Rel Lk Texana
Built 1956
US 59 NB over Navidad Riv. West Relief
Built 1976
LP 521 over POST OAK BRANCH
Built 1929
EAST DIVISION ST over POST OAK BRANCH
Built 1997
US 59 over Post Oak Branch
Built 1972
Bridge Details
- Structure #
- 131210008904121
- Year Built
- 1972
- Length
- 53.3 m (174.9 ft)
- Max Span
- 22.9 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 2
- Daily Traffic
- 11,663
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.