IH 10 EB over BALDRIDGE CREEK

1.60 MI E OF SH 97 · County 177, Texas · Built 1972 · 2 Lanes · 17,316 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

29.678525, -97.276986

This bridge is in worse condition than 46.6% of bridges in County 177. The average bridge in Texas is 0 years old; this one is 54 years old.

Nearby Bridges

Bridge Details

Structure #
130900053505155
Year Built
1972
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
17,316
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.