HOLUB RD over MIDDLE CREEK

1.60 MI E OF US 77 · County 149, Texas · Built 2022 · 2 Lanes · 109 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
130760AA0307002
Year Built
2022
Length
27.4 m (89.9 ft)
Max Span
27.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
109
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.