PIANO BRIDGE RD over ROCKY CREEK
0.35 MI W OF FM 1383 · County 149, Texas · Built 1990 · 1 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
29.728497, -96.839483
This bridge is in worse condition than 62% of bridges in County 149. The average bridge in Texas is 0 years old; this one is 36 years old.
Nearby Bridges
PIANO BRIDGE ROAD over EAST NAVIDAD RIVER
Built 1900
FM 1383 over ROCKY CREEK
Built 1958
DUBINA-WEIMAR RD over DRAW
Built 1983
FM 1383 over MILL CREEK
Built 1958
FM 1383 over Branch Navidad River
Built 1958
DUBINA-WEIMAR RD over DRAW
Built 2015
US 90 over East Navidad River
Built 2013
IH 10 WB over US 90
Built 1967
IH 10 EB over US 90
Built 1967
PARMA RD over DRAW
Built 2023
Bridge Details
- Structure #
- 130760AA0189002
- Year Built
- 1990
- Length
- 25.9 m (85 ft)
- Max Span
- 23.8 m
- Width
- 5.3 m (17.4 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Steel
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,000
- Total Project Cost
- $4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.