GUETTERMANN-EHLER over DRAW
0.9 MI W OF FM 956 · County 149, Texas · Built 1990 · 1 Lanes · 60 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
29.764411, -96.982053
This bridge is in worse condition than 88.3% of bridges in County 149. The average bridge in Texas is 0 years old; this one is 36 years old.
Nearby Bridges
SCHULZE RD over WEST NAVIDAD RIVER
Built 2003
SCHILHAB BOTTOM LP over WEST NAVIDAD RIVER
Built 1985
GUETTERMANN-EHLER over DRAW
Built 1991
GEBERT RD over DRAW
Built 2015
FM 2238 over West Navidad River
Built 1955
FM 956 over WALKER BRANCH
Built 1951
BRUNO RD over WALKER BRANCH
Built 2023
FM 3171 over Draw
Built 1969
EHLER-GRASSHOFF RD over HACKBERRY BRANCH
Built 1989
FM 2238 over Hackberry Branch
Built 1955
Bridge Details
- Structure #
- 130760AA0126001
- Year Built
- 1990
- Length
- 13.1 m (43 ft)
- Max Span
- 11.6 m
- Width
- 5.3 m (17.4 ft)
- Lanes
- 1
- Daily Traffic
- 60
- Material
- Steel
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.