IH 10 WB over DRAW
3.80 MI E OF SH 95 · County 149, Texas · Built 1969 · 2 Lanes · 16,528 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
29.697844, -97.044631
This bridge is in worse condition than 62% of bridges in County 149. The average bridge in Texas is 0 years old; this one is 57 years old.
Nearby Bridges
IH 10 EB over Draw
Built 1969
LADEWIG LANE over ROCKY CREEK
Built 2005
KNEZEK RD over IH 10
Built 1969
IH 10 over Draw
Built 1969
FREYBURG-ENGLE RD over ROCKY CREEK
Built 1988
US 90 over Trib of Mulberry Creek
Built 1940
LOUIS HERZIK RD over DRAW
Built 1993
FREYBURG-ENGLE RD over COLD CREEK
Built 1988
FAREK-LOTH RD over COLD CREEK
Built 2020
FAREK-LOTH RD over DRAW
Built 1985
Bridge Details
- Structure #
- 130760053506105
- Year Built
- 1969
- Length
- 6.7 m (22 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 16,528
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.