MATEJEK RD over DRAW

0.57 MI N OF KUBALA STORE · County 123, Texas · Built 2019 · 2 Lanes · 33 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
130620AA0161001
Year Built
2019
Length
11.6 m (38.1 ft)
Max Span
11.6 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
33
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.