US 77 SB over PECK BRANCH

0.25 MI S OF LAVACA C/L · County 123, Texas · Built 2009 · 2 Lanes · 3,471 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
130620037003051
Year Built
2009
Length
160 m (524.9 ft)
Max Span
22.9 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
3,471
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.