IH 10 EBML over CHURCH CREEK

1.8 MI E of FM 949 · County 089, Texas · Built 2024 · 3 Lanes · 48,625 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
130450027101819
Year Built
2024
Length
45.7 m (149.9 ft)
Max Span
15.2 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
48,625
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.