MATSON RD over AQUA DULCE BRANCH
0.02 MI NW OF SH 35 · County 057, Texas · Built 1998 · 2 Lanes · 42 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
28.577561, -96.702536
This bridge is in worse condition than 76% of bridges in County 057. The average bridge in Texas is 0 years old; this one is 28 years old.
Nearby Bridges
SH 35 over BIG CHOCOLATE BAYOU REL
Built 1998
SH 35 over BIG CHOCOLATE BYU
Built 1958
SWEETWATER ROAD over AGUA DULCE BRANCH
Built 2013
SWEETWATER ROAD over CHOCOLATE BAYOU
Built 1984
FM 2541 over DRAW
Built 1968
FM 1679 over DRAW
Built 1954
FM 2433 over DRAW
Built 1958
SH 35 over BNSF RAILROAD
Built 2003
FM 1679 over DRAINAGE DITCH
Built 1954
FM 1679 over CHOCOLATE BAYOU
Built 2008
Bridge Details
- Structure #
- 130290AA0360001
- Year Built
- 1998
- Length
- 39.6 m (129.9 ft)
- Max Span
- 21.3 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 42
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.