RIPPLE LN over SANDY CREEK
1.6 MI NE OF SH 109 · County 015, Texas · Built 2016 · 2 Lanes · 60 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.926461, -96.471439
This bridge is in worse condition than 36.7% of bridges in County 015. The average bridge in Texas is 0 years old; this one is 10 years old.
Nearby Bridges
SHUNKA RD over DRAW
Built 2009
FM 109 over SPRING BRANCH CREEK
Built 1938
BUECHMANN RD over SANDY CREEK
Built 2012
HENKHAUS RD over DRAW
Built 2011
STAR HILL RD over POST OAK POINT CREEK
Built 2013
NEW BREMEN RD over POST OAK POINT CREEK
Built 2017
MEITH RD over POST OAK POINT CREEK
Built 2010
NEW BREMEN RD over MECKELROY BRANCH
Built 2024
FM 109 over POST OAK POINT CREEK
Built 1982
POST OAK POINT RD over POST OAK POINT CREEK
Built 2012
Bridge Details
- Structure #
- 130080AA6540002
- Year Built
- 2016
- Length
- 21.3 m (69.9 ft)
- Max Span
- 21.3 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 60
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.