POST OAK POINT RD over DRAW
0.6 MI SE OF SH 159 · County 015, Texas · Built 2013 · 2 Lanes · 45 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.970747, -96.573981
This bridge is in worse condition than 45.4% of bridges in County 015. The average bridge in Texas is 0 years old; this one is 13 years old.
Nearby Bridges
SH 159 over FORD TRAIN BRANCH
Built 1931
SH 159 over WILLOW BRANCH
Built 1928
SECATES RD over POPLAR CREEK
Built 1989
SH 159 over MAREK BRANCH
Built 1931
WUNDERLICH RD over KREB BRANCH
Built 2004
FORDTRAN ROAD over DRAW
Built 2005
FM 954 over JONES CREEK
Built 1961
SKULL CREEK RD over SKULL CREEK
Built 2002
SCHOENAU RD over SKULL CREEK
Built 1999
WILLOW SPRINGS RD over JONES CREEK
Built 1983
Bridge Details
- Structure #
- 130080AA5183001
- Year Built
- 2013
- Length
- 15.5 m (50.9 ft)
- Max Span
- 15.2 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 45
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.