NEWBERG RD over PANTHER CREEK

2.25 MI W OF FM 949 · County 015, Texas · Built 1988 · 2 Lanes · 131 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
130080AA0164002
Year Built
1988
Length
8.5 m (27.9 ft)
Max Span
4 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
131
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.