MOUNT ZION RD over IRONS CREEK

0.02 MI E OF DIEMER RD. · County 473, Texas · Built 2014 · 2 Lanes · 320 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
122370AA0117001
Year Built
2014
Length
27.4 m (89.9 ft)
Max Span
15.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
320
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.